Items required in the field for Inspection:

  • Approved site plan
  • Solar plans, these will not have a building dept stamp on them.
  • Job card
  • Permit
  • 10 kw or less Check list

Steps:

  • Look for all items mentioned above
  • Check for no electrical in CWP structures, (if any)
  • Make sure everything is according to the plan and all items on the check list are marked yes. If all is correct you can final this permit.
  • If there are any discrepancies from the plan to the field, then a correction notice will be required.
  • The check list only applies to 10kw or less it is not required for 10kw or more.
  • Do not write a correction for a checklist if the plans are approved and the system is over 10kw