Schedule the following inspections:

  • Ground electrode
  • Rough electric
  • Grounding and bonding
  • Service panel

Requirements:

  • Must have approved site plan identifying well and pump location, main panel location and disconnect location.
  • Site plan must show location of proposed crop location.
  • Permit, job card and approved electric to well single line stamped by County of Riverside must be on site.
  • All electrical must be complete and exposed for inspection.
  • All grounding and bonding must be complete, well casing if metal, ground rods and metal boxes.
  • All conduit from service to disconnect and pump must be in place, if buried then potholes at both ends and 50’ intervals will be fine to verify burial depth.
  • All irrigation must be in place up to the location of the proposed crops.
  • These are 100 A max busbar rating, read label to verify, must be rated for outdoor use.
  • This will be allowed to have the main breaker and the disconnect breaker only, there are no other circuits allowed to be attached. No breakers, no outlets. No exceptions.